Skip to content

About this article

  • Audience: Operators and integrators evaluating production readiness
  • Goal: Understand what soak grading measures and where to find formal criteria
  • Type: Concept

Summary

Ghost Protocol grades shadow deployments using automated soak gates, visual verification harnesses, and MQTT contract checks. Public docs describe the process; detailed grading rubrics and session results stay in operator-controlled repositories.

What grading covers

AreaWhat passes look like
MQTT contractStable ~10 Hz telemetry, valid detection schema
Encoder / H.265Recent chunks without prolonged stall streaks
ThermalDie temperature within soak gate thresholds
StorageWARNING or better before long runs; prune if CRITICAL
Visual gatesOptional harness checks for playback-ready clips

How to run grading workflows

  1. Complete first operator tasks
  2. Use the shadow orchestrator for reproducible soak batches (soaks guide)
  3. Interpret failures via common issues

Next steps

Operator depth

Full grading criteria, historical soak tables, and harness JSON live in private operator handoff (not published).